TAMAMLANAN PROJELER

CEO’muz olarak göreve başlayan Atila Akçal’ın CEO’luk yaptığı TOKAR A.Ş. nin tamamlamış olduğu projeler :

Agaoglu Maslak 1453
ISTANBUL

            Owner : Akdeniz Construction
                Scope :  HVAC & Plumbing
                Contract Date : 06.08.2014

Kent Plaza Mall
KONYA

 
Owner : DEHA Real Estate Investmen
                   Construction
Scope :  Mechanical & Plumbing Works 
Contract Date : 22.08.2011

Conrad Hotel Beşiktas / ISTANBUL

Owner: Yeditepe International Hotels
Scope : Dismantling of the old mechanical and
plumbing equipment,procurement and installation of new mechanical and plumbing equipment such as pumps,heat exchangers, expansiontank, piping and insulation. Addition of absorption type chiller and hot water boiler,Water cooling chiller, Warm water accumulation,Absorption type chiller, Cooling water tower
Contract Date : 01.06.2011

Flame Tower Hotel
Office and Residences - BAKU

Owner : DIA Group
Scope :   Complete design, supply, installation,
commissioning and maintenance of HVAC, plumbing and fire fighting system of Hotel and residences.
Contract Date : 11.02.2010


SCC – Sports Concert Complex – BAKU

Main Contractor : ALPINE BAU DEUTSCHLAND AG
Scope : Heating, Ventilating, Air-Conditioning, Fire fighting and Plumbing works together with Electrical installation of a Sports- and Concert Hall for 30 spectators
Contract Date : 12.10.2011

Moscow City, Plot 14 Mercury City Tower

Owner : ZAO “Mercury City Tower”
Main Contractor Rasen Story
Scope : Complete design, supply, engineering,
procurement, installation, commissioning
and maintenance of HVAC, fire protection
Contract Date : 04.04.2010

Etiler Tourism Center ISTANBUL

Owner : MAKYOL
Scope : Complete engineering, procurement,
installation, commissioning and
maintenance of HVAC, fire protection,
plumbing and building management systems of office and hotel.
Contract Date : 19.03.2010


Hilton Garden Inn Hotel KONYA

Owner : Kosifler Construction
Scope : Complete design, supply, installation,
commissioning and maintenance of HVAC,
plumbing, fire fighting and BMS of Hotel and
Shopping Mall.
Contract Date : 11.02.2010

Moscow City, Plot 9 – Capital City Project

Owner : Capital Group Main Contractor Ant Yapi
Scope : Complete design, supply, engineering,
procurement, installation, commissioning
and maintenance of HVAC, fire protection, plumbing and building management system of a multifunctional complex.
Contract Date : September 2006

Erbil International Airport Erbil Iraq

Owner : Northern Iraq Govt.
Contractor : Mak-Yol – Cengiz Construction JV Scope : Complete design, supply, installation,commissioning and maintenance of all HVAC,plumbing, fire protection and buildingmanagement systems of all buildings,including passanger terminal, VIP terminal and utility buildings
Contract Date : September 2006

Anthill Residence – ISTANBUL

Owner : Ant Yapi
Scope :Complete design, supply, installation,
commissioning and maintenance of HVAC,
fire protection, plumbing and building
management systems of residence.
Contract Date : 18.08.2009

Hilton Garden Inn Hotel – MARDIN

Owner : KOSIFLER Construction
Scope : Complete design, supply, installation,
commissioning and maintenance of HVAC,
plumbing, fire fighting and BMS of Hotel and
Shopping Mall.
Contract Date : 03.01.2011

Hilton Garden Inn Hotel and Shopping Center-URFA

Owner : Kosifler Construction
Scope : Complete design, supply, installation,
commissioning and maintenance of
HVAC, plumbing, fire fighting and BMS of
Hotel and Shopping Mall.
Contract Date : 11.02.2010

Hilton Garden Inn Hotel and Shopping Center-URFA

Owner : Ant Yapi
Scope : Complete engineering, procurement, installation,commissioning and maintenance of HVAC fire protection,plumbing and building managements systems of the Hotel.
Contract Date : 08.04.2011

Hilton Garden Inn Hotel & Shopping Mall-KUTAHYA

Owner : Kosifler Construction
Scope : Complete design, supply, installation,
commissioning and maintenance of
HVAC,plumbing, fire fighting and BMS of
Hotel and Shopping Mall.
Contract Date : 26.03.2009

Sutluce Cultural Center – ISTANBUL

Owner : Istanbul Municipality
Contractor : Yeni Yapi
Scope : Complete design, supply installation,
commissioning and maintenance of HVAC, fire protection, plumbing and building management systems of an exhibition center with 2 congress halls and 3 cinemas.
Contract Date : September 2008

Skopje US Embassy Project - MACEDONIA

Owner : US Government
Contractor : Kellogg Brown and Root Services, Inc. Scope : HVAC, plumbing and fire fighting system installation of the U.S. Embassy Compound.
Contract Date : June 2007

Lykia Links Golf Hotel - ANTALYA

Owner : Silkar Tourism
Scope : Complete engineering, procurement, installation,commissioning and maintenance of HVAC, fire protection, and
plumbing systems of a 5-star golf hotel
Contract Date : October 2006

Grand Efes Swissotel - IZMIR

Owner : Buyuk Efes Otelcilik
Scope Complete, supply, engineering,
procurement, installation, commissioning
and maintenance of HVAC, fire
protection, plumbing and building
management systems of 402-room 5-star
hotel including a convention center.
Contract Date : September 2006

Maslak Office Tower - ISTANBUL

Owner : Cengiz Construction
Scope : Complete engineering, procurement, installation and commissioning of HVAC, fire protection,plumbing and building management systems of an office tower. Contract Date : August 2006

Frito-Lay Natural Oil Factory In Tarsus /MERSIN

Owner :Frito-Lay Contractor Yapı Merkezi Construction Scope: HVAC, Plumbing , fire fighting, natural gas, steam generation pressurized air systems as well as process water, oil, nitrogen distribution; nitrogen tanks and oil storage tanks of Frito-Lay factory. Contract Date : 15.06.2006

Abdi Ibrahim Office Tower - ISTANBUL

Owner : Abdi Ibrahim Pharmaceuticals
Scope : Complete engineering, procurement, installation and commissioning of HVAC, fire protection, plumbing and building management systems of an office tower. Contract Date : June 2004

King’ s Academy - JORDAN

Owner : Kingdom of Jordan
Scope : Complete design, supply, installation,
commissioning and maintenance of
HVAC, fire protection, plumbing and
building management systems of an
academic campus Contract Date : June 2004

John Hopkins Hospital – ISTANBUL

Owner : Anadolu Foundation
Scope : Complete design, supply, installation,
commissioning, maintenance, all electromechanical works, HVAC, fire
protection, plumbing and building management systems of all buildings
Contract Date March 2003 (Main Block), October 2007 Bone Marrow Transplant Unit 

Hosim War Games Simulation Center - ISTANBUL

Owner : Ministry of Defense
Scope : Complete design, supply, installation,
commissioning and maintenance of
HVAC, fire protection, plumbing and
building management systems
Contract Date : April 2002

Eurocentrum – WARSAW

Owner : 8 Star Sp. z o.o.
Scope : Complete design, supply, installation,
commissioning and maintenance of HVAC, fire protection, plumbing and building management systems of all building
Contract Date : October 2001

Movenpick Hotel - BODRUM

Owner : Mak-Yol
Scope : Complete engineering, procurement
installation and commissioning of HVAC,
fire protection and plumbing systems of a
5-star hotel. Contract Date : August 2006

Ford Otosan Manufacturing Plant - KOCAELI

Owner : Koc Holding
Scope : Complete design, supply, installation,
commissioning and maintenance of HVAC, fire protection, plumbing and building management systems of all building
Contract Date : June 1999

Koc University Campus - ISTANBUL

Owner : Koc Holding
Scope : Complete design, supply, installation,
commissioning and maintenance of
HVAC, fire protection, plumbing and
building management systems of all
buildings Contract Date : February 1999

Sabanci University Campus- ISTANBUL

Owner : Sabanci Holding
Scope : Complete design, supply, installation,
commissioning and maintenance of HVAC, fire fighting, plumbing and building management systems of all buildings Contract Date : August 1999

Istanbul Metro – ISTANBUL

Owner : Istanbul Municipality
Contractor Cegelec S.A. (which later became
ALSTOM S.A.)
Scope : Installation and shop drawings, local
supplies, fabrication, complete
installation of local and imported
equipment, start-up, commissioning of
HVAC system for 6 Metro stations
Contract Date : 03 April 1998

Lutfi Kirdar Convention & Exhibition Center - ISTANBUL

Owner : Kalkinma Holding
Scope : Complete design, supply, installation,
commissioning and maintenance HVAC, fire
protection, plumbing and building management systems of the Convention and Exhibition center.
Contract Date : September 1995

Sabanci Towers - ISTANBUL

Owner : Sabancı Holding
Contractor Koray Construction
Scope : Complete design, supply, installation,
commissioning and maintenance of
HVAC, fire protection, plumbing and
building management systems of an office
complex
Contract Date : March 1991

Corniche Commercial Center - JEDDAH

Owner : H.R.H. Prince Métier Bin Abdul Aziz
Scope : Complete design, supply, installation,
commissioning, maintenance and 2-year operation of HVAC systems,
Control Room Equipment and installations. Local and remote control panels and
systems
Contract Date : March 1982

Suzer Tower and The Ritz Carlton Hotel - ISTANBUL

Owner : Suzer Holding
Scope : Complete design, supply, installation,
commissioning and maintenance of
HVAC, fire protection, plumbing and building management systems of hotel, residences and an office tower
Contract Date : July 1997

Istanbul Metro – ISTANBUL

Owner : Republic of Turkey Ministry of Culture Scope :  Complete design, supply, installation, commissioning and maintenance of HVAC, fire alarm, plumbing systems
Contract Date : July 1973

PETKIM Ethylene Factory Capacity Increase - IZMIR

Owner : PETKIM Petrochemical Industries
Contractor MITSUI Engineering and TOKAR
Scope : Detailed Engineering, Equipment /
Material Procurement, Civil Works
Mechanical Erection on EPC model
turnkey basis
Contract Date : 05.10.2011

Catalagzi Thermal Power Plant - ZONGULDAK

Owner : EREN ENERGY
Scope : Mechanical Erection of Boiler, Air Cool Condenser, Electrostatic Precipitator and Structural Steel of Coal Fired Power Plant Boiler 456t/h – 160MWe
Contract Date : November 2007

Tüpras-Izmir/Aliaga Refinery

Owner : Turkish Petroleum Refineries Inc.
(TÜPRAŞ)
Scope : Design, manufacturing and erection of 2 x135 m3 floating roof rude oil storage
tanks at Aliaga refinery.
Contract Date : February 2007

Petkim Petrochemical Industries Aliaga-IZMIR Modernization Of Steam Gen. Plant (4X350t/h)

Owner : PETKİM Petrochemical Industries Inc.Contractor ANSALDO CALDAIE (Italy) & TOKAR Consortium Scope : Conversion of firing system from oil to dual firing natural gas and/or oil of 4 existing boilers supplied by MHI and erected by TOKAR in the early 1980’s. Addition of a ALSTOM 50MWe Gas Turbine with Feed Water Re-powering system Contract Date : March 2005

Petkim Refinery LDPE Plant–Aliaga/IZMIR

Owner : PETKIM Petrochemical Industries
Scope : Construction and Erection of 3rd Line of Tubular Type LDPE Plant 120 ton/
year Contract Date : September 2002

Iskenderun Sugozu Power Plant Units I-II Ceyhan-ADANA

Owner : ISKEN Energy Production Company
Contractor Gama-Tekfen JV
Scope : 2x660MW Thermal Power Plant imported coal fired boilers and team turbines boiler structural steels for
Unit I-II (Total 13.5 ton app.) and Main Cycle
Piping between boiler and turbine for
Unit II 785 ton MP and HP piping app.)
Contract Dates : 2001- 2002

Afsin - Elbistan Thermal Power Plant – B - K.MARAS

Owner : Turkish Electricity Generation Inc. EUAS Contractor Mitsubishi-Babcock Borsig-Gama-Tekfen- Tokar-Enka Consortium
Scope : LSTK construction of a 4×360 MW brown coal fired thermal power plant. Civil and erection works of the boiler island, FGD
units, coal/ash handling and environmental protection systems.
Contract Date : 2000

Botas LNG Terminal Extension-TEKIRDAG

Owner : BOTAS Pipeline Corporation
Contractor TOKAR-ATLAS Consortium
Scope : Installation of a new open rack sea vaporizer (ORV) with capacity of 228,000 Nm³/hr, 2 sea water pumps, 675 m³ capacity warm water basin, four warm water pumps and 800 m. 52”, 60” and 30” cement lined pipes. Complete civil, mechanical
installation and piping works, electrical and instrumentation, painting and cryogenic insulation for the above extension works with partly supply.
Contract Date : May 1999

Esenyurt Cogeneration Power Plant – ISTANBUL

Owner : Mission Energy USA and PARTNERS
Contractor TPS Netherlands (EPC)
Scope : Combined Cycle Power Plant 3 x 40 MW (Frame 6 GT) 1 x 75 MW Steam Turbine
and 180 MW output for district heating.
Onshore package including all local
supply, all civil works, mechanical,
electrical and instrumentation work plus
insulation, painting and tank fabrication
and erection and fabrication of air cooled
condenser parts
Contract Date : February 1997

Buzmein Gas Turbine Power Plant- TURKMENISTAN

Owner : Turkmenistan Power Authority, Kuvvat Contractor GE, Perini/ USA
Scope : 1 x 127 MW Gas Turbine (Frame 9 GT). Complete erection and installation of mechanical, piping, electrical and
instrumentation works.
Contract Date : March 1996

Clinical and Hazardous Waste Incineration Plant-IZMIT

Owner Izmit Municipality
Contractor Vinsan A.S. Turkey, Lurgi Germany
Scope : Installations for receiving, processing,
incinerating, scrubbing and disposal of
clinical and hazardous waste. Mechanical
and electrical erection of all components
including waste heat boiler and air cooled
condenser.
Contract Date : June 1995

Ammonia and Fertilizer Installations-GEMLIK

Owner : TUGSAS Turkish Fertilizer Industries Co., Inc. Scope Interconnecting electrical installations and steam lines
between Gemlik ammonia and Fertilizer
installations and sea water fire
fighting system. Complete piping, mechanical and electrical erection, instrumentation and automation including all civil
works pertaining to above and part of local
supply.
Contract Date : August , 1989

Murted Airbase – ANKARA

Owner Turkish Aerospace Industries TAI
Scope Chemical Processing system of building No 20 Murted Air Base for F-16 aircraft’s parts, underground chemical drainage and pumping systems including special concreting, piping and pumps, chemical dip tanks
(titanium and SS steel), fume scrubber, above ground facilities including
electrical works, piping instrumentation, overhead cranes and
demineralization system etc., complete detailed engineering, imported and local
supply, civil, mechanical,
electrical, piping and instrumentation works,
complete tests and
start-up
Contract Date : November 1986

Seyitomer Thermal Power Plant IV - KUTAHYA

Owner : Turkish Electricity Authority (TEK)
Contractor VKW/-BBG, Germany
Scope : 1×150 MW Thermal Power Plant Complete Erection of
the Boiler and T-G Island (17,000 tons app.)
Contract Date : February 1984

Ipras Petroleum Refinery 2nd Expansion- IZMIT

Owner : TUPRAS Turkish Petroleum Refineries, Inc.
Scope : 5 Million tons/year capacity expansion of Ipras Refinery. Complete erection of mechanical equipment and steel structures (4,000tons),prefabrication and erection of pipe spools (2,250 tons), fabrication and erection of field run piping (2,450 tons) and
installation of 167 km instrumentation cable and various instruments for
the following on site plants; Crude oil distillation unit, asphalt unit, plat former/ desulphurizer units, LPG/NAPHTA/DEA/MEROX units, 32 MW Turbo- generator unit,
3×100 T/H steam generating,
440m3/H water supply and treatment
facility, pumps and piping installation.
Contract Date : 1979 – 1980